What would you like to see CP build in 2000

What would you like to see CP build in 2000

Post by Raptor1 » Sun, 15 Nov 1998 04:00:00

Ok I would like to see Cedar Point spend about 30 million in undergoing a
double coaster project for the year 2000.
The first coaster would be a launched B&M Sit-Down coaster. Now this coaster
would not have a design like the hulk but a whole new original design. I was
thinking the loops on the coaster should be these.
Top Hat after launch, 2 vertical loops, Camelback, Batwing,immelman, inclined
dive roll at 25 degrees,wingover, corkscrew
The coasters launch system should be by S&S and be the first ever air launch on
a coaster. I was thinking a launch from 0-65 mph in 3 seconds would be the type
of launch I would LOVE to see. Also coming out of a tunnel would be cool.
As for the location of the ride behind Mean Streak would be cool if they did
it. They would have to make sure to somehow dike land or built up land into
Lake Erie so that they have more room to built this land. I was thinking the
coaster could be on the land to the back and right of mean streak and also on
the new built up land right behind Mean Streak. A good 4 acres of land to built
the coaster on would be good.  As for having the coaster have tunnels and
trenchs I think it would be a must. I was even thinking they should have a
finalle somehow where the ride would dive down into a huge trench like on
Nemesis and do a corkscrew and vertical loop. That would be SO cool. As for
theming anything western would be fine from El Toro to the name Maverick.

The second coaster should be a remake/newer design of the CP Cyclone. I was
thinking CCI should have the right to do this project. The coaster would be
located where the dophin show was. The coaster should not be exactly like the
old  coaster though. It should have the best parts of the old cyclone mixed and
combined with newer ideas and twists CCI would make to the coaster design. CCI
should even look at older cyclone designs and older twister coasters like
Mr.Twister to try and come up with ideas to add and change to the original CP
Cyclone layout. I think if CCI and Cedar Point spend enough time on the ride it
could easily be as good as the other new for 2000 coaster but for much cheaper
like 4.5 million dollars, compared to about 18-20 million dollars for the B&M
coaster.

Anyways just my 2 cents